There is no minimum power stipulated for the inverter. The candidate may propose the power he considers adequate and sufficient to ensure the performance and efficient distribution of the system.

The use of lithium-ion batteries is mandatory, and gel batteries are not allowed.

Sales or retroactive installations are not eligible. The distribution and/or installation of the systems shall occur only after the contract between the Facility, and the selected company has been signed.

Yes, they are eligible. However, the company must demonstrate that it has a robust and effective customer management system (CRM) that is able to monitor payments and manage the power supply in accordance with the customer's compliance with the payment plan. This includes the ability to suspend or restore power supply where applicable, until full payment for the equipment or service is completed.

Yes, pre-financing is included in the total amount of the incentive awarded to the company. This is an advance on the total value of the contract, intended to support the initial implementation activities of the project.

However, the pre-financing amount may not exceed 75% of the total contract value during the first 12 months of implementation.

All inverters must have a minimum warranty period of 24 months (2 years).

It should be noted that the value of USD 400 does not correspond to the cost of the inverter. This amount represents only the maximum incentive that the Facility can provide per facility

The value of USD 400 per installation was defined based on the average cost of connecting solar systems with AC inverters in off-grid electrification contexts.

This amount represents an intermediate value between the average cost of connecting a Solar Home System (SHS) and the average cost of connecting a mini-grid. In this way, the cap seeks to reflect in a balanced way the typical costs of eligible solutions, while allowing the Facility to support a larger number of beneficiaries and promote an efficient use of available resources.

The minimum warranty required for the system is 24 months. However, the warranty must cover, at least, the contractual period agreed with the customer.

If the customer benefits from a payment plan of more than 24 months, the company must ensure the extension of the guarantee until the end of the contractual period or assume the risks associated with any system failures during this period. Thus, any gap between the minimum guarantee period and the duration of the payment contract will be the responsibility of the company.

No. Only solar inverters intended for Productive Energy Use (PUE) applications will be eligible.

This call aims to support investments that promote productive use activities or income generation through access to energy. Therefore, systems installed exclusively for domestic use will not be considered eligible for support under this Facility.

Yes, these cases can be considered eligible, as long as the main purpose of the system is the Productive Use of Energy (PUE).

The company shall demonstrate that the inverter is used predominantly to support activities of productive use, generating income or economic value. Complementary use for domestic needs does not compromise the eligibility of the installation, as long as its main function remains clearly associated with the productive use of energy.

No. The definition of the base incentive must also consider Areas 2 and 3, even if the company's distribution plan does not provide for sales in these areas.

For the purposes of calculation and evaluation, the principle of the most conservative scenario (worst case scenario) is adopted, ensuring that the base incentive remains applicable and sustainable in all eligible policy areas. Therefore, it is not permissible to set an incentive based solely on the conditions of Areas 0 and 1, where this would result in values exceeding the limits set for Areas 2 and 3.

This window is of private/commercial interest and not social. For this reason, all proposals should be based on financially sustainable business models.

Even when proposals are submitted by non-profit organizations, it will be necessary to prove that the business plan is commercially viable, sustainable, and capable of ensuring continuity of operations over time.

RBF for Innovative Grids

A: Eligible companies must be duly incorporated and registered in Mozambique prior to the submission of the application and operate in the DRE sector. A minimum experience of either at least 2-year in constructing and/or operating Mini Grids in Mozambique or minimum 4 years in distribution/deployment pico-PV and/or solar products for domestic use to households and/or SMEs in Mozambique and/or EPC of off grid solar systems is required.

A: No. Only the experience of the bidding company itself will be considered for evaluation. Prior experience of founders, directors, or technical partners cannot be formally recognized under the Bidder’s Experience or Reference of the Proposed Technology criteria.

A: Yes. Reference installations using the proposed GWVHT technology implemented outside Mozambique may be considered toward the minimum requirement of 200 reference connections, provided they are adequately documented and demonstrate the similarities with the technology and business model proposed in the +Energia Innovative Grids Call for Proposals

A: A technology developer or EPC partner agreement may strengthen the application; however, eligibility and compliance with experience requirements are assessed based on the applicant entity, responsibilities, and contributions of partners must be clearly documented.

A: Yes, an Applicant may be a locally incorporated SPV and work with international partners or technology providers, provided that the Applicant itself meets all eligibility requirements of the Call for Proposals, including incorporation in Mozambique, DRE sector activity, and the required deployment experience, with partnerships clearly documented.

All technologies that meet the requirements of the Call for Proposals are eligible. However, we recommend carefully considering the following constraints commonly associated with hydro mini-grids:

  • Regulatory approval from FUNAE: Innovative grids projects must obtain a No Objection from FUNAE. Pico-hydro systems typically consist of a single generation point and a distribution network, and will therefore likely be classified as standard mini-grids by the competent authority (FUNAE). As a result, they would fall under the mini-grid regulatory framework. Achieving full compliance with mini-grid regulations may prove challenging within the timeframe of the +Energia Fund (Q1 2027).
  • Subsidy level and business model constraints: The proposed subsidy (500 USD per connection) and the project’s required timeframe—specifically the need to present a business plan that becomes profitable within 10 years—may not align well with the typical financial and operational characteristics of hydro systems.

A: Yes, hydro-based systems may be eligible, provided they comply with all the requirements for Innovative Grids under Window 03, including at least 90% renewable energy generation, interconnected connections with energy sharing, a defined upgrade pathway from Tier 1 to Tier 4, and full compliance with the other technical, regulatory, and operational criteria specified in the Call for Proposals.

A: Yes, grid compatibility is not required as long as the system meets all safety, reliability, and service tier requirements and complies with Mozambican law.

A: Yes, an EaaS model is compliant if it provides electricity for at least 10 years with maintenance and replacement of faulty components, and the developer retains ownership of all installed equipment up to and including the meter. However, note that the business plan over 10 years must be profitable. 

A: Yes, local operators or cooperatives may handle O&M as long as the developer retains ownership up to the meter.

A: Yes, tariffs may combine flat monthly fees for Tier 1 users with metered or PAYGO-based consumption for higher tiers, as long as Tier 1 users pay no more than USD 5 per month and all other tariff requirements in the CfP are met.

A: Yes, an Applicant can qualify for the maximum unit subsidy of up to USD 500 per connection, provided the cofinancing quota of 10% is verified, but the actual amount awarded depends on the project’s connection targets, performance, and the Fund Manager’s budget allocation and adjustments.

A: All documents listed in the application form are acceptable to demonstrate the minimum 10% equity contribution, including shareholder commitments, bank letters, and legal registration documents.

A: company can demonstrate the minimum 10% equity contribution using Proof of sufficient funding, Year-End Financial statements (stamped by the Tax Authority) and balance sheet, Completed Business Plan and shareholder commitment letters.

A: Yes, if a company exceeds its projected connection targets, it may access additional RBF disbursements beyond the initially reserved amount on a “first come, first served” basis, subject to available budget and Fund Manager approval.

A: FUNAE No-objection and community leader support letters at the application stage.  ARENE permits, if applicable, are not required to qualify for the subsidy, but they might be imposed afterwards by the competent authority before implementing the project.

A: Yes.

A: Yes, hydropower projects must comply with all applicable Mozambican laws and regulations, including the National Environmental and Social regulatory requirements, before deployment, to ensure full legal and operational compliance.

A: Yes.

A: Yes, direct kWh measurement at the customer’s premises is not required, so hydro systems may use flat fees or PAYGO-based consumption while ensuring service levels and active connections based on payments can be verified.

A: Yes, applicants proposing hydropower-based innovative grids should ensure early compliance with all applicable environmental and water-use permits, demonstrate renewable energy generation and interconnection requirements, and clearly address deployment, monitoring, and verification obligations, as these areas may pose eligibility risks if not properly documented.

A: Yes, new entrants should proactively ensure they are not listed on the Facility’s Exclusion List, fully comply with legal, regulatory, and tax obligations, meet all experience and operational requirements, and have robust environmental, social, and governance (ESG) systems, as failure to address these areas is a common cause of application rejection.

A: Yes, combinations of nano-grids, mini-grids, and mesh grids are eligible; however, standalone Solar Home Systems (SHS) are not eligible, as SHS technologies cannot be interconnected with other systems.

A: No, the program does not provide pre-identified communities; Applicants are free to propose their own sites, which will be validated by the Fund Manager in collaboration with FUNAE, including issuance of a non-objection and support in obtaining community leader endorsement.

A: Innovative Grids are treated in the same way as Solar Home Systems and are not considered mini-grids under the regulatory framework; therefore, no project licensing is required, and Applicants only need to obtain a non-objection from FUNAE and endorsement from the local community leaders.

A: No, there is no flexibility to exceed the maximum subsidy of USD 500 per connection for the first phase, even in highly remote or logistically challenging areas.

A: Yes, such projects may be eligible; however, the level of incentive provided may not be financially sustainable for mini hydro or 30–50 kW mini-grid systems, and applicants should note that standard mini-grids require the appropriate operating licenses, which would entail additional costs. We recommend carefully considering the following constraints commonly associated with hydro mini-grids:

  • Regulatory approval from FUNAE: Innovative grids projects must obtain a No Objection from FUNAE. Pico-hydro systems typically consist of a single generation point and a distribution network, and will therefore likely be classified as standard mini-grids by the competent authority (FUNAE). As a result, they would fall under the mini-grid regulatory framework. Achieving full compliance with mini-grid regulations may prove challenging within the timeframe of the +Energia Fund (Q1 2027).

Subsidy level and business model constraints: The proposed subsidy (500 USD per connection) and the project’s required timeframe—specifically the need to present a business plan that becomes profitable within 10 years—may not align well with the typical financial and operational characteristics of hydro systems.

A: Yes, a non-profit organization may participate as part of a consortium with a private energy company; however, the private company must submit the proposal, act as the signatory to the grant agreement, and eligibility will be assessed solely based on the attributes of the private entity.

A: Grant applications will be evaluated on a rolling basis.

A: This financing is intended exclusively for new electrification areas that will not be electrified by EDM, future mini-grids at FUNAE’s electrification plan, or potentially part of the expansion of an existing mini-grid.

A: No. The Innovative Grids window is limited to physically interconnected systems (e.g., nano, mesh, or similar grids) where connections share energy. standalone battery-rental or distributed battery-as-a-service models are not eligible.

RBF for Locally Produced Clean Cooking Solutions

A: Yes, the applicant may form consortia and/or partnerships with private companies to apply for this call for proposals. In the case of a consortium, only one eligible private company may act as the lead entity and be the holder and signatory of the grant agreement.

A: A non-profit association may apply as part of a consortium with a private company in the energy sector, but the private company must act as the signatory to the grant agreement. However, eligibility will be assessed considering only the attributes of the private entity.

A: This Call for Proposals covers all provinces of the country, except for Cabo Delgado and any districts that may eventually be declared ineligible by the government (FUNAE). Sales made in urban, peri-urban, and rural areas are eligible.

A: The two Calls for Proposals are independent of each other. The same applicant may submit two separate proposals, one for each call, provided that each proposal meets the respective eligibility criteria.

A: Eligible companies must be properly registered in Mozambique and have carried out, as well as demonstrated, production and/or distribution activities of locally produced improved cookstoves over the past three (3) years.

A: No minimum funding amount has been set; only a maximum amount of USD 500,000 per beneficiary is established. This Call for Proposals is launched under an RBF program, where the incentive is granted after verified sales are submitted. The applicant is responsible for financing the project until the results are presented and the incentive is awarded.

A: All locally produced (not assembled) cooking solutions (stoves and non-fuel) of Tier 1 (only until December 2026), Tier 2, and Tier 3 are eligible, provided they are distributed by eligible entities with more than 3 years of production/sales experience in any area of Mozambique, except Cabo Delgado.

Energy as a Service

A: Yes, companies are eligible to apply for funding for two pilots, with a maximum allocation of USD 1 million per pilot. Note that each pilot project of a grant amount of USD 1,000,000 will be evaluated separately. Hence, applicants must provide project specific information separately, including the maximum number of connections that they are able to provide with a grant amount of USD 1,000,000 per pilot project.

A: This pilot project requires that companies seeking funding under this window be duly incorporated in Mozambique, operate within the DRE sector, and possess relevant experience – at least two years – in the
distribution or deployment of pico-PV and/or solar products for domestic use by households and/or SMEs in Mozambique or other countries.

A: Yes, mini-grid operators meeting the eligibility criteria for this window can apply for funding; please refer to the call for proposals for more details.

A: There are no predefined sites for implementation; however, the Facility recommends specific criteria for site selection. Please refer to the call for proposals for more details.

A: No, productive use systems are not eligible for RBF grants under the EaaS window. This window is specifically designed for entry-level solar systems. Please refer to the call for proposals for detailed technical specifications. However, applicants are free to offer PUE in the areas where they operate EaaS.

A: Yes, as long as the chosen sites have a Solar Home Systems/PAYGO penetration rate low enough to allow reaching the desired 50% EaaS system penetration rate.

A: Customers must pay for energy as a service and companies shall implement a maintenance and repair plan to ensure the functionality of products during the service period, of a minimum of five (5) years. The intension is that the EaaS will be available indefinitely, with the supplier maintaining the equipment and no transfer of ownership of the SHS to the customer.

A: For the pilot it’s important that the future customers have access to mobile money, therefor telecom coverage its essential. In parallel the Facility and other projects, work on developing synergies with telecom companies to not only identify such areas but also to expand their network and coverage.

A: The amount of USD 1,000,000 represents the subsidy that will be granted. All project-related costs and any resulting revenues will be the responsibility of the company. It is assumed that the EaaS model will be self-sustaining, including covering future maintenance and product replacement cost. Your business plan must account for all project expenses and clearly outline the subsidy requested. The combination of the subsidy and projected revenues should be sufficient to cover all costs and ensure the long-term sustainability of the model.

A: Companies must ensure that the total amount charged to customers in any given month does not exceed USD 3. While daily payment options must be made available, rates exceeding USD 0.10 per day are permitted, provided that the total monthly fee remains within the USD 3 cap. Within this monthly ceiling, companies are free to design the fee structure they consider most appropriate for the target context.

A: The Facility has a total budget of USD 26 million, of which USD 19 million are allocated to Distributed Renewable Energy (DRE) and USD 7 million to Clean Cooking Solutions (CCS). Several calls for proposals have already been launched, including the current Energy as a Service (EaaS) Call for Proposals, which has an allocated budget of USD 2 million.

A: No, because in the EaaS model, companies do not sell electricity per unit consumed. Instead, they provide SHS to customers on a rental basis, where customers pay for access to the system rather than per kilowatt-hour (kWh) of electricity used. In this sense, the revenue model is similar to PAYGO rent-to-own models, with the key difference being that ownership of the equipment is never transferred to the customer. The system remains the property of the provider, who is also responsible for its maintenance throughout the service period.

A: The USD 3 monthly fee represents the maximum amount that can be charged to customers. Companies are required to specify their proposed pricing structure in their business plans. Price adjustments for inflation are permitted, but any such adjustments or other planned price changes over time must be clearly outlined in the business plan.

A: A product is considered to be in active use if it remains with the customer and has been used regularly within the last three months. As a minimum threshold, a payment of at least USD 0.50. This low threshold is designed to accommodate inclusive models that serve very poor households, who may pay significantly lower fees or may not be able to make payments as consistently as other customers.

Catalytic Grants

A: Applicants are free to propose contractual milestones according to the planned activities. However, the first milestone can represent up to 30% of the total catalytic grant contract value.

A: Yes, applicants must propose a set of contractual milestones for each eligible activity. These will be reviewed and negotiated with the facility manager prior to final approval. Each proposal may include a maximum of six milestones.

A: Yes, both companies enrolled in the RBF program and those not enrolled are eligible, they must meet the eligibility criteria outlined in this call for proposals.

A: Yes, all initiatives aiming to distribute technologies that meet at least Tier 2, according to the ISO methods described in the manual of this call for proposals, are eligible.

A: NGOs are not eligible. However, private companies may submit proposals in consortium with NGOs, with the grant contract being signed exclusively by the private company.

A: Yes, the +Energia facility, through catalytic grants, can support the acquisition of transport and other services that enhance the distribution of technologies meeting at least Tier 2 cooking solutions.

Results Based Financing CCS

A: Yes, companies can submit proposals for more than one funding window (CCS and/or SHS), provided they use the appropriate forms for each window. For CCS, companies can apply with the same proposal for more than one technology or business model (e.g., biomass stoves and LPG).

A: The current implementation period for this program is from March 2025 until March 2027. The Fund Manager will monitor and oversee progress throughout the implementation period, while an Independent Verification Agent (IVA) will verify and monitor the reported results for financing purposes.

A: Contracts will be signed in USD. As of today, companies will be paid in metical according to the applicable exchange rate of the Central Bank.

A: NGOs are not eligible to apply directly. If NGOs wish to participate, they may do so only in collaboration with an eligible private company.
The private company must serve as the signing entity, assume full responsibility for the project, and be the sole recipient and beneficiary of the funding support.

A: Hybrid products are eligible if each technology independently meets the program’s eligibility criteria for its respective category.

A: Yes, wood-based cookstoves are eligible, as long as they meet the eligibility criteria for the CCS window.

A: The 75% of the expected grants in the next year refers to 12 months after the signature of the contract.

A: Yes, electric pressure cookers and induction stoves are eligible, as long as they meet the eligibility criteria for the CCS window.

A: The commercial basis distribution means that the company should sell the stoves to end users, the company is not allowed to distribute the stoves for free. The base grant amount depends on the Tier level of the cooking solution and is calculated based on percentage of FOB price, production cost or selling price. Companies will indicate in their application on what basis they choose to apply the base grant calculation (FOB price, production cost or selling price).

A: No, Acquisition of production machinery is not eligible for grant for this call for proposals. +Energy will launch a Catalytic Grants window, in which the purchase of production machinery is eligible. Only companies with RBF contract will be eligible for the catalytic grant.

A: The Tier of the cookstove is obtained from laboratory test reports. The tests must be conducted in eligible laboratories that comply with the methods and guidance of ISO 19867-1 and performance criteria informed by Technical Report ISO/TR 19867-3.

A: Yes

Results Based Financing DRE

A: Yes, companies can submit proposals for more than one funding window (e.g., CCS and/or SHS).However, they must ensure that each proposal is submitted using the appropriate forms specific to each funding window.

A: The collection incentive is paid after 6 months if the beneficiary collects at least 70% of the expected payments from active customers during the first 6 months of the contract. The formula used is: Collection Rate = Actual Amount Paid / Expected Amount Paid (over 6 months)

A: The current implementation period for this program is from March 2025 until March 2027. The Fund Manager will monitor and oversee progress throughout the implementation period, while an Independent Verification Agent (IVA) will verify and monitor the reported results for financing purposes.

A: Contracts will be signed in USD. As of today, companies will be paid in metical according to the applicable exchange rate of the Central Bank.

A: NGOs are not eligible to apply directly. If NGOs wish to participate, they may do so only in collaboration with an eligible private company. The private company must serve as the signing entity, assume full responsibility for the project, and be the sole recipient and beneficiary of the funding support.

A: The 75% of the expected grants in the next year refers to 12 months after the signature of the contract.

A: The pre-financed amount will be progressively reduced as beneficiaries submit RBF grant disbursement requests. Beneficiaries must provide detailed reports on products purchased using the pre-financing, including serial numbers (if applicable). These reports will be reconciled with the grant disbursement requests, ensuring accountability.

Beneficiaries can submit disbursement requests at any time. They must provide:

  1. Documentation justifying the request for replenishment of pre-financed funds.
  2. A written commitment to use the products purchased with pre-financing exclusively for distributions or connections submitted to the +Energia Facility.
  3. A report of all serial numbers for products purchased with the pre-financing, as requested by the Facility Manager.

Key Points:

  • Replenishment is based on the amount disbursed (e.g., 25%), not the full expected grant amount.
  • Pre-financing can be used for products that are:
    • Already purchased but not yet distributed or installed, provided they were not financed by another facility.

Example Calculation:

  • Expected Grant for 12 Months: USD 100 000
  • Initial pre-financing: USD 75 000 (75% of expected grant)
  • Disbursement claims submitted: USD 20 000
  • Remaining Balance: USD 55 000 (a reduction of 26.7%)
  • Eligible Replenishment: USD 20 000, assuming the expected grant for the next 12 months remains USD 100 000.

Note: If the expected grant amount increases or decreases, the eligible replenishment amount will be adjusted accordingly.

A: The geographic incentive is determined by the installation site, paid out for sales to customers in specific districts according to the level grade of the district (see Annex E from the application form).

A: Yes. Base grant is fixed amount for all eligible systems. Please see below the eligibility criteria for the current window.

Must be a SHS with the following minimum features:

  • Product tier: Tier 1
  • Nominal capacity: 5 Wp
  • Daily capacity: 15 Wh
  • Service: minimum 2 lamps, possible 2000 lumen hours per day, phone charging
  • Availability (day): 4 hours
  • Availability (evening): 2 hours

A: Business Plans and pricing will be analysed to ensure that companies present sustainable proposals and offer long-term after sales service. Unsustainable price dumping will not be allowed. The Facility will analyse company’s plans and monitor their performance to ensure that their commercial strategy is viable and realistic.

A: The first window focuses on entry-level Tier 1 systems, but we are already evaluating the possibility to add other windows for mid to large SHS.

A: For this first window, only Verasol SHS, certified or under certification, are eligible, but we are planning to launch other windows later this year. Solar inverter systems are part of this plan.

A: The verification process will be largely automated and conducted remotely wherever feasible. Companies must provide sales and customer data in a usable electronic format, such as database files, via an appropriate Customer Relationship Management (CRM) or Enterprise Resource Planning (ERP) platform. These platforms must support integration with the Facility’s data management and monitoring platform, Odyssey, through an API. Verification will primarily involve cross-checking customer payments and reconciling them with specific products and customers.

However, for the geographical incentive, automated verification through geolocation is often not possible because most products are not GSM-enabled. As a result, a separate verification process will be conducted by the Independent Verification Agent (IVA) using sampling and phone or field verification, guided by risk metrics. Once completed, the IVA will submit a verification report detailing the results and key findings.

If the IVA is unable to complete the verification process within four weeks, a pre-payment of 75% of the disbursement request will be made, based on preliminary verification by the Facility Manager. Reconciliation and any necessary adjustments will then be carried out in subsequent periods based on the final IVA verification results.

A: For the first window, only SHS sold with consumer financing are eligible. We may consider cash sales in a future window.

A: Yes, as long as they are reported by the Beneficiary of the contract, and the wholesalers or any other partners fulfill with the same requirements that the Facility demands from the beneficiary company (customer data, access to the platform, after sales service, etc.).

Ainda tem dúvidas?

Lorem ipsum dolor sit amet, consectetur adipiscing elit.
Contacte-nos
An Initiative of
Implementor
Partner
© 2026 Mais Energia. All rights reserved.
Privacy PolicyDesign: Signus
chevron-downmenu-circlecross-circle linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram